Product Introduction
This 63 MVA transformer was delivered to Russia in 2005. the rated power of the transformer is 63000 KVA. It is a Step-down transformer 220KV to 110KV, the HV of the transformer is 220kv, and the LV is 110kv. Our 63 MVA transformer was designed with advanced technology and adopts high quality material and components which result in reliable quality and long operation time.
SCOTECH ensure each one of our delivered transformers had passed the full acceptance test and we remains 0 fault rate record for more than 10 years so far, oil immersed power transformer is designed in accordance with IEC, ANSI and other major international standards.
Scope of Supply
Product: Oil Immersed Power Transformer
Rated Power: Up to 200 MVA
Primary Voltage: Up to 230 KV
Technical Specification
63 MVA 220KV to 35KV transformer specifications and data sheet
Delivered to | Russia |
Year | 2005 |
Model | SZ11-63 MVA-220/35KV |
Type | Oil Immersed Power Transformer |
Standard | IEC60076 |
Rated Power | 63 MVA |
Frequency | 50 HZ |
Phase | Three |
Cooling Type | ONAF |
Primary Voltage | 220 KV |
Secondary Voltage | 35 KV |
Winding Material | Copper |
Vector Group | Dyn11 |
Impedance | 10% |
Tap Changer | OLTC (Huaming brand) |
Tapping Range | ±8*1.25% |
No Load Loss | 4.5 |
On Load Loss | 38 |
Accessories | Standard Configuration |
Remarks | N/A |
63 MVA 220/35KV Transformer Manufacturing
Finished 63 MVA 220/35KV Transformer
Lifting the 63 MVA transformer in the port
What are the main parts of a transformer?
There are three basic parts of a transformer:
1. An iron core which serves as a magnetic conductor,
2. A primary winding or coil of wire and
3. A secondary winding or coil of wire.
The primary is usually referred to as the input; the secondary as the output.
FAQ
1. How soon can you delivery the transformer?
It depends on the quantity and capacity of the transformer, normally within one month since the date drawing confirmed by buyer.
2. How long can you provide the quality warranty?
12 months since the date transformer operated.
3. What payment method do you accept?
T/T (wire transfer), L/C both accepted.